
Project overview
Divertek’s photos document work in progress on Ecclesia’s low-slope roof. The aerial view shows the size of the work area. At roof level, you can see the crew handling membrane and working around the pipes that pass through it.
Wide shots show where the crew and rolls of membrane were positioned across the roof as the work progressed.
In the close-ups, follow the membrane to the base of a vent. That junction is one of the places where the roof has to shed water around a break in its surface.
Photo gallery
See the Divertek crew at work and follow the details from the broad roof surface down to individual penetrations.










Tell us what’s on the roof today, what needs attention and how the building is used.